Rendered at 10:57:31 07/30/25
Full-size item image
Primary image for Inage 51602Bg Bathroom Faucet With Pop Up Drain Waterfall Single, Deck Mount.
Item image 1
Item image 2
Item image 3
Item image 4
Item image 5
Item image 6
Free Shipping

Inage 51602Bg Bathroom Faucet With Pop Up Drain Waterfall Single, Deck Mount.

$82.62 CAD
Ships from United States Us

Don't miss out on this item!

There are only 3 left in stock.

Shipping options

Seller handling time is 3 business days Details
No shipping price specified to CA
Ships from United States Us

Offer policy

OBO - Seller accepts offers on this item. Details

Return policy

Full refund available within 30 days

Purchase protection

Payment options

PayPal accepted
PayPal Credit accepted
Venmo accepted
PayPal, MasterCard, Visa, Discover, and American Express accepted
Maestro accepted
Amazon Pay accepted
Nuvei accepted

Shipping options

Seller handling time is 3 business days Details
No shipping price specified to CA
Ships from United States Us

Offer policy

OBO - Seller accepts offers on this item. Details

Return policy

Full refund available within 30 days

Purchase protection

Payment options

PayPal accepted
PayPal Credit accepted
Venmo accepted
PayPal, MasterCard, Visa, Discover, and American Express accepted
Maestro accepted
Amazon Pay accepted
Nuvei accepted

Item traits

Category:

Bathroom Sink Faucets

Quantity Available:

3 in stock

Condition:

New

UPC:

713837127788

Brand:

INAGE

Finish:

Brushed

Color:

Brushed Gold

Mounting Type:

Deck Mount

Finish Type:

Brushed

Number Of Handles:

1

Included Components:

Drain, Installation Hardware, Instruction Manual

Handle Type:

Lever

Installation Method:

Centerset

Item Dimensions Lx Wx H:

14.5 X 9 X 3.1 Inches

Model Name:

In51602

Handle Material:

Brass

Item Weight:

5.99 Pounds

Product Dimensions:

14.5 X 9 X 3.1 Inches

Item Model Number:

In51602

Listing details

Shipping discount:

Seller pays shipping for this item.

Posted for sale:

More than a week ago

Item number:

1641041044

Item description

Inage 51602Bg Bathroom Faucet With Pop Up Drain Waterfall Single, Deck Mount. Product Features ?Durable Material?- Lead-free solid brass construction for superior rust resistance, copper metal single handle, touchscreen RV sink faucet for durability and safety! Ceramic spool reduces leak points,water-saving and cost-effective. ?Easy DIY to Install?- The bathrrom faucet comes with all the accessories including deck plate and pop up drain. Designed to easily install with standard U.S. plumbing connections and clearly listing the installation size information, you can install with confidence.You can also save PLUMBING INSTALLTION FEE. You can install with confidence. ?Waterfall Spout?- The bathroom faucet spout provides a visually pleasing waterfall of water like a stream, which helps create a serene bathroom environment. ?Single Handle Design?- Single handle design for effortless flow and temperature control. Pop up drain comes with the single hand faucet. ?100% Satisfaction Service?- We offer 24-hour customer service and 30-day unconditional returns. We provide you with the best products and services. If there is any problem with the product, please feel free to let us know and we will fix it for you. Shipping: Shipping is complimentary within the lower 48 US States. We Do Not Ship to PO/APO Boxes, HI or Alaska We Do Not Ship Outside of the Continental US All items ship within 24-72 hours of Payment For large items that require Freight shipping a valid phone number is required to call and schedule your delivery Terms of Sale and Feedback: Feedback is extremely important to us and If you are satisfied with our transaction, please take a moment to leave Positive Feedback. YOUR Satisfaction is our #1 Priority! If there are any issues, PLEASE contact us BEFORE leaving a neutral or negative rating so that we may resolve any concerns. We PROMISE we can make you happy if you give us a fair chance. Returns / Concerns: All items qualify for returns within 14 - 30 days of receipt. Buyer is responsible for return shipping on any item that is not damaged Please be sure this is an item you want before making your purchase. Customer Satisfaction is our TOP priority! All items are IN STOCK at time of listing. Inventory changes constantly and it is impossible to maintain a perfectly accurate count of all items. Please do not penalize us if we have to issue you a refund! Thank You For Your Business!